Doel nuclear power plant
Doel nuclear power plant is a nuclear power station in Belgium with 1 operating unit totalling 1,090 MW gross. The site has 4 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 4 | PWR | WH 3LP | 1,090 | 1985 | |
| Unit 1 | Retired | PWR | WH 2LP | 454 | 1975 |
| Unit 2 | Retired | PWR | WH 2LP | 454 | 1975 |
| Unit 3 | Retired | PWR | WH 3LP | 1,056 | 1982 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Doel nuclear power plant 4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 3-loop |
| Size class | Large |
| Gross capacity | 1,090MW |
| Net capacity | 1,038MW |
| Thermal output | 2,988MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Planned retirement | 2035planned, not actual |
| Owner | Societes Reunies D'Energie Du Bassin De L'Escaut SA100% |
| Operator | Engie Electrabel EDF Belgium EDF Luminus |
| Construction start | 1 Dec 1978 |
|---|---|
| First criticality | 31 Mar 1985 |
| Grid connection | 8 Apr 1985 |
| Commercial operation | 1 Jul 1985 |
Live status, outage record and fuel chain for Doel nuclear power plant 4
Doel nuclear power plant 1 Retired
Permanently shut down on 15 February 2025 under Belgium's nuclear phase-out law, after the GNPT record was last researched in May 2024.
status:
operating → retired
· IAEA Power Reactor Information System, reactor record DOEL-1
· verified 2026-09-06
Permanently shut down on 15 February 2025 under Belgium's nuclear phase-out law, after the GNPT record was last researched in May 2024.
permanent_shutdown:
not set → 2025-02-14
· IAEA Power Reactor Information System, reactor record DOEL-1
· verified 2026-09-06
Permanently shut down on 15 February 2025 under Belgium's nuclear phase-out law, after the GNPT record was last researched in May 2024.
retirement_year:
not set → 2025
· IAEA Power Reactor Information System, reactor record DOEL-1
· verified 2026-09-06
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 2-loop |
| Size class | Large |
| Gross capacity | 454MW |
| Net capacity | 445MW |
| Thermal output | 1,311MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Indivision Doel100% |
| Operator | Engie Electrabel EDF Belgium EDF Luminus |
| Construction start | 1 Jul 1969 |
|---|---|
| First criticality | 18 Jul 1974 |
| Grid connection | 28 Aug 1974 |
| Commercial operation | 15 Feb 1975 |
| Permanent shutdown | 14 Feb 2025 |
Doel nuclear power plant 2 Retired
Permanently shut down on 30 November 2025, after the GNPT record was last researched in May 2024.
status:
operating → retired
· IAEA Power Reactor Information System, reactor record DOEL-2
· verified 2026-09-06
Permanently shut down on 30 November 2025, after the GNPT record was last researched in May 2024.
permanent_shutdown:
not set → 2025-11-30
· IAEA Power Reactor Information System, reactor record DOEL-2
· verified 2026-09-06
Permanently shut down on 30 November 2025, after the GNPT record was last researched in May 2024.
retirement_year:
not set → 2025
· IAEA Power Reactor Information System, reactor record DOEL-2
· verified 2026-09-06
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 2-loop |
| Size class | Large |
| Gross capacity | 454MW |
| Net capacity | 445MW |
| Thermal output | 1,311MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Indivision Doel100% |
| Operator | Engie Electrabel EDF Belgium EDF Luminus |
| Construction start | 1 Sep 1971 |
|---|---|
| First criticality | 4 Aug 1975 |
| Grid connection | 21 Aug 1975 |
| Commercial operation | 1 Dec 1975 |
| Permanent shutdown | 30 Nov 2025 |
Doel nuclear power plant 3 Retired
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | Westinghouse 3-loop |
| Size class | Large |
| Gross capacity | 1,056MW |
| Net capacity | 1,006MW |
| Thermal output | 3,054MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | Societes Reunies D'Energie Du Bassin De L'Escaut SA100% |
| Operator | Engie Electrabel EDF Belgium EDF Luminus |
| Construction start | 1 Jan 1975 |
|---|---|
| First criticality | 14 Jun 1982 |
| Grid connection | 23 Jun 1982 |
| Commercial operation | 1 Oct 1982 |
| Permanent shutdown | 23 Sep 2022 |
Doel nuclear power plant in context
By gross operating capacity Doel nuclear power plant is the 1st largest of 2 operating nuclear sites in Belgium, holding 50% of the country's operating capacity, and ranks 141st of 172 worldwide.
Its operating unit started up in 1985; the unit is 41.0 years old.
The 4 units with both construction and grid dates on record took 4.0 to 7.5 years (median 5.8) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.
The nearest other tracked nuclear sites are Borssele nuclear power plant (39 km), Tihange nuclear power plant (113 km) and Chooz nuclear power plant (142 km).
The current net rating of Unit 4 differs from its design net capacity by +3.8% (1,000 MW at design, 1,038 MW now).
The tracker lists a planned retirement year, a forecast and not a decision on record, for 1 operating unit: Unit 4 (2035).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1969 | 1974 | 5.2 | 5.4 (1970s) |
| Unit 2 | 1971 | 1975 | 4.0 | 5.4 (1970s) |
| Unit 3 | 1975 | 1982 | 7.5 | 7.3 (1980s) |
| Unit 4 | 1978 | 1985 | 6.4 | 7.3 (1980s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Borssele nuclear power plant | Netherlands | 39 km | 0.5 |
| Tihange nuclear power plant | Belgium | 113 km | 1.1 |
| Chooz nuclear power plant | France | 142 km | 3.1 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Doel nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Vlaams, Belgium |
|---|---|
| Coordinates | 51.3254, 4.2597 |
| Elevation | about 10 mabove sea level |
| Setting | On the sea coast |
| Region | Western Europe |
| Units by status | Operating: 1 Retired: 3 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Indivision Doel Societes Reunies D'Energie Du Bassin De L'Escaut SA |
|---|---|
| Operators | Engie Electrabel EDF Belgium EDF Luminus |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06