Zhangzhou nuclear power plant is a nuclear power station in China with 2 operating units totalling 2,424 MW gross. The site has 6 units on record in total.

Operating4Under construction1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
6
Operating
2
Operating capacity
2,424MW
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1-1 Operating PWR HPR-1000 1,212 2025
Unit 1-2 Operating PWR HPR-1000 1,212 2026
Unit 2-3 Under construction PWR HPR-1000 1,214 2028
Unit 2-4 Under construction PWR HPR-1000 1,214 2029
Unit 3-5 Announced PWR - 1,150 -
Unit 3-6 Announced PWR - 1,150 -

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Zhangzhou nuclear power plant 1-1 Operating

Reactor typePressurised water reactor (PWR)
ModelHPR-1000
Size classLarge
Gross capacity1,212MW
Net capacity1,126MW
Thermal output3,180MWt
Enrichment3–5% U-235
NSSS vendorChina National Nuclear Corporation
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Zhangzhou Energy
Construction start16 Oct 2019
Grid connection28 Nov 2024
Commercial operation1 Jan 2025

Zhangzhou nuclear power plant 1-2 Operating

Reactor typePressurised water reactor (PWR)
ModelHPR-1000
Size classLarge
Gross capacity1,212MW
Net capacity1,126MW
Thermal output3,190MWt
Enrichment3–5% U-235
NSSS vendorChina National Nuclear Corporation
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Zhangzhou Energy
Construction start4 Sep 2020
First criticality3 Nov 2025
Grid connection22 Nov 2025
Commercial operation1 Jan 2026

Zhangzhou nuclear power plant 2-3 Under construction

Reactor typePressurised water reactor (PWR)
ModelHPR-1000
Size classLarge
Gross capacity1,214MW
Net capacity1,129MW
Thermal output3,180MWt
Enrichment3–5% U-235
NSSS vendorChina National Nuclear Corporation
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Zhangzhou Energy
Construction start22 Feb 2024
Commercial operation1 Jan 2028

Zhangzhou nuclear power plant 2-4 Under construction

Reactor typePressurised water reactor (PWR)
ModelHPR-1000
Size classLarge
Gross capacity1,214MW
Net capacity1,129MW
Thermal output3,180MWt
Enrichment3–5% U-235
NSSS vendorChina National Nuclear Corporation
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Zhangzhou Energy
Construction start27 Sep 2024
Commercial operation1 Jan 2029

Zhangzhou nuclear power plant 3-5 Announced

Reactor typePressurised water reactor (PWR)
Modelnot disclosed
Size classLarge
Gross capacity1,150MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendornot on record
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Zhangzhou Energy
Milestonesno dates on record

Zhangzhou nuclear power plant 3-6 Announced

Reactor typePressurised water reactor (PWR)
Modelnot disclosed
Size classLarge
Gross capacity1,150MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendornot on record
OwnerChina National Nuclear Power Co Ltd100%
OperatorCNNC Zhangzhou Energy
Milestonesno dates on record

Zhangzhou nuclear power plant in context

By gross operating capacity Zhangzhou nuclear power plant is the 12th largest of 18 operating nuclear sites in China, holding 4% of the country's operating capacity, and ranks 64th of 172 worldwide.

Its operating units started up between 2025 and 2026; the median unit is 0.5 years old, younger than the median of 10.0 in China.

The 2 units with both construction and grid dates on record took 5.1 to 5.2 years (median 5.2) from construction start to grid connection; the median across all reactors connected in the 2020s is 7.7 years.

The nearest other tracked nuclear sites are Lufeng nuclear power plant (210 km), Fuqing nuclear power plant (266 km) and Taipingling nuclear power plant (286 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1-1201920245.17.7 (2020s)
Unit 1-2202020255.27.7 (2020s)

Nearest tracked nuclear sites

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationLieyu, Fujian, China
Coordinates23.8289, 117.4949
Elevationabout 10 mabove sea level
SettingOn the sea coast, 0.6 km from the water
RegionEastern Asia
Units by status
Operating: 2
Under construction: 2
Announced: 2

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
China National Nuclear Power Co Ltd
Operators
CNNC Zhangzhou Energy

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.