Fuqing nuclear power plant
Fuqing nuclear power plant is a nuclear power station in China with 6 operating units totalling 6,667 MW gross. The site has 6 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | CNP-1000 | 1,089 | 2014 | |
| Unit 2 | PWR | CNP-1000 | 1,089 | 2015 | |
| Unit 3 | PWR | CNP-1000 | 1,089 | 2016 | |
| Unit 4 | PWR | CNP-1000 | 1,089 | 2017 | |
| Unit 5 | PWR | HPR-1000 | 1,161 | 2021 | |
| Unit 6 | PWR | HPR-1000 | 1,150 | 2022 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Fuqing nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-1000 |
| Size class | Large |
| Gross capacity | 1,089MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Fujian Fuqing Nuclear Power |
| Construction start | 1 Jan 2008 |
|---|---|
| First criticality | 24 Jul 2014 |
| Grid connection | 20 Aug 2014 |
| Commercial operation | 22 Nov 2014 |
Fuqing nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-1000 |
| Size class | Large |
| Gross capacity | 1,089MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Fujian Fuqing Nuclear Power |
| Construction start | 1 Jan 2009 |
|---|---|
| First criticality | 22 Jul 2015 |
| Grid connection | 6 Aug 2015 |
| Commercial operation | 16 Oct 2015 |
Fuqing nuclear power plant 3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-1000 |
| Size class | Large |
| Gross capacity | 1,089MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Fujian Fuqing Nuclear Power |
| Construction start | 31 Dec 2010 |
|---|---|
| First criticality | 3 Jul 2016 |
| Grid connection | 7 Sep 2016 |
| Commercial operation | 24 Oct 2016 |
Fuqing nuclear power plant 4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-1000 |
| Size class | Large |
| Gross capacity | 1,089MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Fujian Fuqing Nuclear Power |
| Construction start | 17 Nov 2012 |
|---|---|
| First criticality | 16 Jul 2017 |
| Grid connection | 29 Jul 2017 |
| Commercial operation | 17 Sep 2017 |
Fuqing nuclear power plant 5
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,161MW |
| Net capacity | 1,075MW |
| Thermal output | 3,050MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Fujian Fuqing Nuclear Power |
| Construction start | 7 May 2015 |
|---|---|
| First criticality | 21 Oct 2020 |
| Grid connection | 27 Nov 2020 |
| Commercial operation | 29 Jan 2021 |
Fuqing nuclear power plant 6
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,150MW |
| Net capacity | 1,075MW |
| Thermal output | 3,060MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | Fujian Fuqing Nuclear Power |
| Construction start | 22 Dec 2015 |
|---|---|
| First criticality | 11 Dec 2021 |
| Grid connection | 1 Jan 2022 |
| Commercial operation | 25 Mar 2022 |
Fuqing nuclear power plant in context
By gross operating capacity Fuqing nuclear power plant is the 2nd largest of 18 operating nuclear sites in China, holding 10% of the country's operating capacity, and ranks 3rd of 172 worldwide.
Its operating units started up between 2014 and 2022; the median unit is 9.5 years old, younger than the median of 10.0 in China.
The 6 units with both construction and grid dates on record took 4.7 to 6.6 years (median 5.9) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
The nearest other tracked nuclear sites are Ningde nuclear power plant (197 km), Cangnan San'ao nuclear power plant (223 km) and Zhangzhou nuclear power plant (266 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 2008 | 2014 | 6.6 | 5.9 (2010s) |
| Unit 2 | 2009 | 2015 | 6.6 | 5.9 (2010s) |
| Unit 3 | 2010 | 2016 | 5.7 | 5.9 (2010s) |
| Unit 4 | 2012 | 2017 | 4.7 | 5.9 (2010s) |
| Unit 5 | 2015 | 2020 | 5.6 | 7.7 (2020s) |
| Unit 6 | 2015 | 2022 | 6.0 | 7.7 (2020s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Ningde nuclear power plant | China | 197 km | 4.4 |
| Cangnan San'ao nuclear power plant | China | 223 km | 1.2 |
| Zhangzhou nuclear power plant | China | 266 km | 2.4 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Fuqing nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Sanshan, Fujian, China |
|---|---|
| Coordinates | 25.4403, 119.4426 |
| Elevation | about 15 mabove sea level |
| Setting | On the sea coast, 0.1 km from the water |
| Region | Eastern Asia |
| Units by status | Operating: 6 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | China National Nuclear Power Co Ltd |
|---|---|
| Operators | Fujian Fuqing Nuclear Power |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data