Yangjiang nuclear power plant
Yangjiang nuclear power plant is a nuclear power station in China with 6 operating units totalling 6,516 MW gross. The site has 6 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | CPR-1000 | 1,086 | 2014 | |
| Unit 2 | PWR | CPR-1000 | 1,086 | 2015 | |
| Unit 3 | PWR | CPR-1000 | 1,086 | 2016 | |
| Unit 4 | PWR | CPR-1000 | 1,086 | 2017 | |
| Unit 5 | PWR | ACPR-1000 | 1,086 | 2018 | |
| Unit 6 | PWR | ACPR-1000 | 1,086 | 2019 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Yangjiang nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,086MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | China General Nuclear Power Co Ltd100% |
| Operator | Yangjiang Nuclear Power |
| Construction start | 1 Jan 2008 |
|---|---|
| First criticality | 23 Dec 2013 |
| Grid connection | 31 Dec 2013 |
| Commercial operation | 25 Mar 2014 |
Yangjiang nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,086MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | China General Nuclear Power Co Ltd100% |
| Operator | Yangjiang Nuclear Power |
| Construction start | 1 Jan 2009 |
|---|---|
| First criticality | 2 Mar 2015 |
| Grid connection | 10 Mar 2015 |
| Commercial operation | 5 Jun 2015 |
Yangjiang nuclear power plant 3
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,086MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | China General Nuclear Power Co Ltd100% |
| Operator | Yangjiang Nuclear Power |
| Construction start | 15 Nov 2010 |
|---|---|
| First criticality | 11 Oct 2015 |
| Grid connection | 18 Oct 2015 |
| Commercial operation | 1 Jan 2016 |
Yangjiang nuclear power plant 4
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CPR-1000 |
| Size class | Large |
| Gross capacity | 1,086MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China General Nuclear Power Group |
| Owner | China General Nuclear Power Co Ltd100% |
| Operator | Yangjiang Nuclear Power |
| Construction start | 17 Nov 2012 |
|---|---|
| First criticality | 30 Dec 2016 |
| Grid connection | 8 Jan 2017 |
| Commercial operation | 15 Mar 2017 |
Yangjiang nuclear power plant 5
GNPT gives a first criticality of 1 January 2013, before the unit's own construction start on 18 September 2013: a year-only placeholder. The World Nuclear Association database lists first criticality on 16 May 2018.
first_criticality:
2013-01-01 → 2018-05-16
· World Nuclear Association, Nuclear Reactor Database, Yangjiang 5
· verified 2026-10-22
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | ACPR-1000 |
| Size class | Large |
| Gross capacity | 1,086MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China General Nuclear Power Co Ltd100% |
| Operator | Yangjiang Nuclear Power |
| Construction start | 18 Sep 2013 |
|---|---|
| First criticality | 16 May 2018 |
| Grid connection | 23 May 2018 |
| Commercial operation | 12 Jul 2018 |
Yangjiang nuclear power plant 6
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | ACPR-1000 |
| Size class | Large |
| Gross capacity | 1,086MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | China General Nuclear Power Co Ltd100% |
| Operator | Yangjiang Nuclear Power |
| Construction start | 23 Dec 2013 |
|---|---|
| First criticality | 1 Jan 2014 |
| Grid connection | 29 Jun 2019 |
| Commercial operation | 24 Jul 2019 |
Yangjiang nuclear power plant in context
By gross operating capacity Yangjiang nuclear power plant is the 4th largest of 18 operating nuclear sites in China, holding 10% of the country's operating capacity, and ranks 5th of 172 worldwide.
Its operating units started up between 2014 and 2019; the median unit is 9.5 years old, younger than the median of 10.0 in China.
The 6 units with both construction and grid dates on record took 4.1 to 6.2 years (median 5.2) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
The nearest other tracked nuclear sites are Taishan nuclear power plant (78 km), Lianjiang nuclear power plant (253 km) and Daya Bay nuclear power plant (255 km).
2 operating units are rated differently now from their design net capacities: Unit 1 -2.1% and Unit 5 -2.1%.
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 2008 | 2013 | 6.0 | 5.9 (2010s) |
| Unit 2 | 2009 | 2015 | 6.2 | 5.9 (2010s) |
| Unit 3 | 2010 | 2015 | 4.9 | 5.9 (2010s) |
| Unit 4 | 2012 | 2017 | 4.1 | 5.9 (2010s) |
| Unit 5 | 2013 | 2018 | 4.7 | 5.9 (2010s) |
| Unit 6 | 2013 | 2019 | 5.5 | 5.9 (2010s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Taishan nuclear power plant | China | 78 km | 3.5 |
| Lianjiang nuclear power plant | China | 253 km | - |
| Daya Bay nuclear power plant | China | 255 km | 2.0 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Yangjiang nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Dongping, Guangdong, China |
|---|---|
| Coordinates | 21.7092, 112.2607 |
| Elevation | about 65 mabove sea level |
| Setting | On the sea coast, 0.2 km from the water |
| Region | Eastern Asia |
| Units by status | Operating: 6 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | China General Nuclear Power Co Ltd |
|---|---|
| Operators | Yangjiang Nuclear Power |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data