Penly nuclear power plant is a nuclear power station in France with 2 operating units totalling 2,764 MW gross. The site has 4 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | P4 REP 1300 | 1,382 | 1990 | |
| Unit 2 | PWR | P4 REP 1300 | 1,382 | 1992 | |
| Unit 3 | Pre-construction | PWR | EPR2 | 1,650 | 2038 |
| Unit 4 | Pre-construction | PWR | EPR2 | 1,650 | 2038 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Penly nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | P4 1300 MWe series |
| Size class | Large |
| Gross capacity | 1,382MW |
| Net capacity | 1,330MW |
| Thermal output | 3,817MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Sep 1982 |
|---|---|
| First criticality | 1 Apr 1990 |
| Grid connection | 4 May 1990 |
| Commercial operation | 1 Dec 1990 |
Live status, outage record and fuel chain for Penly nuclear power plant 1
Penly nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | P4 1300 MWe series |
| Size class | Large |
| Gross capacity | 1,382MW |
| Net capacity | 1,330MW |
| Thermal output | 3,817MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Aug 1984 |
|---|---|
| First criticality | 10 Jan 1992 |
| Grid connection | 4 Feb 1992 |
| Commercial operation | 1 Nov 1992 |
Live status, outage record and fuel chain for Penly nuclear power plant 2
Penly nuclear power plant 3 Pre-construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | EPR2 |
| Size class | Large |
| Gross capacity | 1,650MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Jan 2027 |
|---|---|
| Commercial operation | 1 Jan 2038 |
Penly nuclear power plant 4 Pre-construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | EPR2 |
| Size class | Large |
| Gross capacity | 1,650MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Framatome |
| Owner | Electricité de France SA100% |
| Operator | Electricité de France |
| Construction start | 1 Jan 2027 |
|---|---|
| Commercial operation | 1 Jan 2038 |
Penly nuclear power plant in context
By gross operating capacity Penly nuclear power plant is the 13th largest of 18 operating nuclear sites in France, holding 4% of the country's operating capacity, and ranks 47th of 172 worldwide.
Its operating units started up between 1990 and 1992; the median unit is 35.0 years old, younger than the median of 41.0 in France.
The 2 units with both construction and grid dates on record took 7.5 to 7.7 years (median 7.6) from construction start to grid connection; the median across all reactors connected in the 1990s is 8.0 years.
The nearest other tracked nuclear sites are Paluel nuclear power plant (43 km), Gravelines nuclear power plant (133 km) and Flamanville nuclear power plant (227 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 1982 | 1990 | 7.7 | 8.0 (1990s) |
| Unit 2 | 1984 | 1992 | 7.5 | 8.0 (1990s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Paluel nuclear power plant | France | 43 km | 5.5 |
| Gravelines nuclear power plant | France | 133 km | 5.7 |
| Flamanville nuclear power plant | France | 227 km | 4.4 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Penly nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Petit-Caux, Normandie, France |
|---|---|
| Coordinates | 49.9764, 1.2107 |
| Elevation | about 25 mabove sea level |
| Setting | On the sea coast |
| Region | Western Europe |
| Units by status | Operating: 2 Pre-construction: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Electricité de France SA |
|---|---|
| Operators | Electricité de France |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data