| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1-1 | Under construction | PWR | AP-1000 | 1,290 | 2028 |
| Unit 1-2 | Under construction | PWR | AP-1000 | 1,290 | 2029 |
| Unit 2-3 | Under construction | PWR | VVER-1200/V-491 | 1,274 | 2027 |
| Unit 2-4 | Under construction | PWR | VVER-1200/V-491 | 1,274 | 2028 |
| Unit 3-5 | Announced | PWR | - | 1,250 | - |
| Unit 3-6 | Announced | PWR | - | 1,250 | - |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Xudapu nuclear power plant 1-1 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | AP-1000 |
| Size class | Large |
| Gross capacity | 1,290MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Liaoning Nuclear Power |
| Construction start | 15 Nov 2023 |
|---|---|
| Commercial operation | 1 Jan 2028 |
Xudapu nuclear power plant 1-2 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | AP-1000 |
| Size class | Large |
| Gross capacity | 1,290MW |
| Net capacity | 1,000MW |
| Thermal output | 2,905MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Westinghouse Electric Company |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Liaoning Nuclear Power |
| Construction start | 17 Jul 2024 |
|---|---|
| Commercial operation | 1 Jan 2029 |
Xudapu nuclear power plant 2-3 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200/V-491 |
| Size class | Large |
| Gross capacity | 1,274MW |
| Net capacity | 1,200MW |
| Thermal output | 3,200MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Liaoning Nuclear Power |
| Construction start | 1 May 2021 |
|---|---|
| Commercial operation | 1 Jan 2027 |
Xudapu nuclear power plant 2-4 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | VVER-1200/V-491 |
| Size class | Large |
| Gross capacity | 1,274MW |
| Net capacity | 1,200MW |
| Thermal output | 3,200MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | Rosatom |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Liaoning Nuclear Power |
| Construction start | 1 May 2021 |
|---|---|
| Commercial operation | 1 Jan 2028 |
Xudapu nuclear power plant 3-5 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | not disclosed |
| Size class | Large |
| Gross capacity | 1,250MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | not on record |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Liaoning Nuclear Power |
| Milestones | no dates on record |
|---|
Xudapu nuclear power plant 3-6 Announced
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | not disclosed |
| Size class | Large |
| Gross capacity | 1,250MW |
| Net capacity | not disclosed |
| Thermal output | not disclosed |
| Enrichment | 3–5% U-235 |
| NSSS vendor | not on record |
| Owner | China National Nuclear Power Co Ltd100% |
| Operator | CNNC Liaoning Nuclear Power |
| Milestones | no dates on record |
|---|
Xudapu nuclear power plant in context
The nearest other tracked nuclear sites are Hongyanhe nuclear power plant (100 km).
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Hongyanhe nuclear power plant | China | 100 km | 6.7 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Xudapu nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Xudapu, Liaoning, China |
|---|---|
| Coordinates | 40.3528, 120.5486 |
| Elevation | about 10 mabove sea level |
| Setting | On the sea coast, 0.4 km from the water |
| Region | Eastern Asia |
| Units by status | Under construction: 4 Announced: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | China National Nuclear Power Co Ltd |
|---|---|
| Operators | CNNC Liaoning Nuclear Power |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06
- GEM.wiki entry (further reading) , CC BY-SA 4.0, linked, not quoted
How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data