Rajasthan nuclear power plant

Rajasthan nuclear power plant is a nuclear power station in India with 6 operating units totalling 1,780 MW gross. The site has 8 units on record in total.

Operating1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
8
Operating
6
Operating capacity
1,780MW
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 2 Operating PHWR Horizontal Pressure Tube type 200 1981
Unit 3 Operating PHWR Horizontal Pressure Tube type 220 2000
Unit 4 Operating PHWR Horizontal Pressure Tube type 220 2000
Unit 5 Operating PHWR Horizontal Pressure Tube type 220 2010
Unit 6 Operating PHWR Horizontal Pressure Tube type 220 2010
Unit 7 Operating PHWR Horizontal Pressure Tube type 700 2025
Unit 8 Under construction PHWR Horizontal Pressure Tube type 700 2026
Unit 1 Mothballed PHWR Horizontal Pressure Tube type 100 1973

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Rajasthan nuclear power plant 2 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classSmall
Gross capacity200MW
Net capacity187MW
Thermal output693MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start1 Apr 1968
First criticality8 Oct 1980
Grid connection1 Nov 1980
Commercial operation1 Apr 1981

Rajasthan nuclear power plant 3 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classSmall
Gross capacity220MW
Net capacity202MW
Thermal output801MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start1 Feb 1990
First criticality24 Dec 1999
Grid connection10 Mar 2000
Commercial operation1 Jun 2000

Rajasthan nuclear power plant 4 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classSmall
Gross capacity220MW
Net capacity202MW
Thermal output801MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start1 Oct 1990
First criticality3 Nov 2000
Grid connection17 Nov 2000
Commercial operation23 Dec 2000

Rajasthan nuclear power plant 5 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classSmall
Gross capacity220MW
Net capacity202MW
Thermal output801MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start18 Sep 2002
First criticality24 Nov 2009
Grid connection22 Dec 2009
Commercial operation4 Feb 2010

Rajasthan nuclear power plant 6 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classSmall
Gross capacity220MW
Net capacity202MW
Thermal output801MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start20 Jan 2003
First criticality23 Jan 2010
Grid connection28 Mar 2010
Commercial operation31 Mar 2010

Rajasthan nuclear power plant 7 Operating

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classLarge
Gross capacity700MW
Net capacity630MW
Thermal output2,177MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start18 Jul 2011
First criticality19 Sep 2024
Grid connection17 Mar 2025
Commercial operation15 Apr 2025

Rajasthan nuclear power plant 8 Under construction

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classLarge
Gross capacity700MW
Net capacity630MW
Thermal output2,177MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start30 Sep 2011
Commercial operation1 Jan 2026

Rajasthan nuclear power plant 1 Mothballed

Reactor typePressurised heavy water reactor (PHWR)
ModelIndian PHWR
Size classSmall
Gross capacity100MW
Net capacity90MW
Thermal output346MWt
EnrichmentNatural uranium, 0.71% U-235no enrichment required
NSSS vendorNuclear Power Corporation of India
OwnerNuclear Power Corporation Of India Ltd100%
OperatorNuclear Power Corporation Of India
Construction start1 Aug 1965
First criticality11 Aug 1972
Grid connection30 Nov 1972
Commercial operation16 Dec 1973

Rajasthan nuclear power plant in context

By gross operating capacity Rajasthan nuclear power plant is the 3rd largest of 7 operating nuclear sites in India, holding 21% of the country's operating capacity, and ranks 106th of 172 worldwide.

Its operating units started up between 1981 and 2025; the median unit is 21.0 years old, younger than the median of 23.5 in India.

The 6 units with both construction and grid dates on record took 7.2 to 13.7 years (median 10.1) from construction start to grid connection; the median across all reactors connected in the 2000s is 6.8 years.

No other nuclear site with an exact position in this dataset lies within 300 km.

The current net rating of Unit 2 differs from its design net capacity by -9.7% (207 MW at design, 187 MW now).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 21968198012.67.3 (1980s)
Unit 31990200010.16.8 (2000s)
Unit 41990200010.16.8 (2000s)
Unit 5200220097.36.8 (2000s)
Unit 6200320107.25.9 (2010s)
Unit 72011202513.77.7 (2020s)

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationRajasthan, India
Coordinates24.8747, 75.6189
Elevationabout 390 mabove sea level
SettingAbout 400 km from the sea
RegionSouthern Asia
Units by status
Operating: 6
Under construction: 1
Mothballed: 1

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Nuclear Power Corporation Of India Ltd
Operators
Nuclear Power Corporation Of India

Put this plant on your own page: embed a card, or compare it with another plant.