Palisades nuclear power plant

Palisades nuclear power plant is a nuclear site in United States with 4 units on record. None is currently operating.

Operating7Under construction1Retired2circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
4
Operating
0
Operating capacity
not disclosed

Units

UnitStatusTypeModelGross MWOnline
Unit Unit 1 Repower Under construction PWR CE (2-loop) DRYAMB 800 2026
Unit 1 Retired PWR CE 2LP (DRYAMB) 850 1971
Unit 2 Pre-construction - SMR-300 300 2030
Unit 3 Pre-construction - SMR-300 300 2030

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Palisades nuclear power plant Unit 1 Repower Under construction

Reactor typePressurised water reactor (PWR)
ModelCE (2-loop) DRYAMB
Size classLarge
Gross capacity800MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment3–5% U-235
NSSS vendorCombustion Engineering
OwnerHoltec International100%
Commercial operation1 Jan 2026

Live status, outage record and fuel chain for Palisades nuclear power plant Unit 1 Repower

Palisades nuclear power plant 1 Retired

Corrected against a later source

GNPT records commercial operation as 1 January 1971 and permanent shutdown as 1 May 2022, which are placeholders (a bare year and a bare month). The IAEA PRIS record, as published in the World Nuclear Association database, gives commercial operation on 31 December 1971, two days after grid connection on 29 December 1971, and permanent shutdown on 20 May 2022.

commercial_operation: 1971-01-01 → 1971-12-31 · World Nuclear Association, Nuclear Reactor Database, Palisades (data credited to IAEA PRIS) · verified 2026-10-28

GNPT records commercial operation as 1 January 1971 and permanent shutdown as 1 May 2022, which are placeholders (a bare year and a bare month). The IAEA PRIS record, as published in the World Nuclear Association database, gives commercial operation on 31 December 1971, two days after grid connection on 29 December 1971, and permanent shutdown on 20 May 2022.

permanent_shutdown: 2022-05-01 → 2022-05-20 · World Nuclear Association, Nuclear Reactor Database, Palisades (data credited to IAEA PRIS) · verified 2026-10-28

Reactor typePressurised water reactor (PWR)
ModelCombustion Engineering 2-loop
Size classLarge
Gross capacity850MW
Net capacity805MW
Thermal output2,565MWt
Enrichment3–5% U-235
NSSS vendorCombustion Engineering
OwnerEntergy Nuclear Operations Inc100%
OperatorEntergy Nuclear Operations
Construction start12 Mar 1967
First criticality22 May 1971
Grid connection29 Dec 1971
Commercial operation31 Dec 1971
Permanent shutdown20 May 2022

Palisades nuclear power plant 2 Pre-construction

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity300MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendorHoltec International
OwnerHoltec International100%
Commercial operation1 Jan 2030

Palisades nuclear power plant 3 Pre-construction

Reactor typesmall modular reactor
ModelSMR-300
Size classSmall
Gross capacity300MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichmentnot established
NSSS vendorHoltec International
Commercial operation1 Jan 2030

Palisades nuclear power plant in context

The one unit with both construction and grid dates on record took 4.8 years from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.

The nearest other tracked nuclear sites are Donald C Cook nuclear power plant (44 km), Dresden nuclear power plant (192 km) and Braidwood nuclear power plant (199 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1196719714.85.4 (1970s)

Nearest tracked nuclear sites

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationMichigan, United States
Coordinates42.3230, -86.3146
Elevationabout 185 mabove sea level
SettingOn the shore of a large lake, 2.1 km from the water
RegionNorthern America
Units by status
Under construction: 1
Retired: 1
Pre-construction: 2

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Entergy Nuclear Operations Inc
Holtec International
Operators
Entergy Nuclear Operations

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.