Dresden nuclear power plant is a nuclear power station in United States with 2 operating units totalling 1,885 MW gross. The site has 3 units on record in total.

Operating7Under construction1Pre-construction1Retired2circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
3
Operating
2
Operating capacity
1,885MW

Units

UnitStatusTypeModelGross MWOnline
Unit 2 Operating BWR BWR-3 (Mark 1) 950 1970
Unit 3 Operating BWR BWR-3 (Mark 1) 935 1971
Unit 1 Retired BWR - 207 1960

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Dresden nuclear power plant 2 Operating

Reactor typeBoiling water reactor (BWR)
ModelBWR-3
Size classLarge
Gross capacity950MW
Net capacity894MW
Thermal output2,957MWt
Enrichment3–5% U-235
NSSS vendorGE Vernova Hitachi Nuclear Energy
OwnerExelon Corp100%
OperatorExelon Generation
Construction start10 Jan 1966
First criticality7 Jan 1970
Grid connection13 Apr 1970
Commercial operation9 Jun 1970

Live status, outage record and fuel chain for Dresden nuclear power plant 2

Dresden nuclear power plant 3 Operating

Reactor typeBoiling water reactor (BWR)
ModelBWR-3
Size classLarge
Gross capacity935MW
Net capacity879MW
Thermal output2,957MWt
Enrichment3–5% U-235
NSSS vendorGE Vernova Hitachi Nuclear Energy
OwnerExelon Corp100%
OperatorExelon Generation
Construction start14 Oct 1966
First criticality12 Jan 1971
Grid connection22 Jul 1971
Commercial operation16 Nov 1971

Live status, outage record and fuel chain for Dresden nuclear power plant 3

Dresden nuclear power plant 1 Retired

Reactor typeBoiling water reactor (BWR)
Modelnot disclosed
Size classSmall
Gross capacity207MW
Net capacity197MW
Thermal output700MWt
Enrichment3–5% U-235
NSSS vendornot on record
OperatorExelon Generation
Construction start1 May 1956
First criticality15 Oct 1959
Grid connection15 Apr 1960
Commercial operation4 Jul 1960
Permanent shutdown31 Oct 1978

Dresden nuclear power plant in context

By gross operating capacity Dresden nuclear power plant is the 27th largest of 54 operating nuclear sites in the United States, holding 2% of the country's operating capacity, and ranks 99th of 172 worldwide.

Its operating units started up between 1970 and 1971; the median unit is 55.5 years old, older than the median of 45.0 in the United States.

The 3 units with both construction and grid dates on record took 4.0 to 4.8 years (median 4.3) from construction start to grid connection; the median across all reactors connected in the 1970s is 5.4 years.

The nearest other tracked nuclear sites are Braidwood nuclear power plant (17 km), LaSalle nuclear power plant (37 km) and Byron nuclear power plant (113 km).

2 operating units are rated differently now from their design net capacities: Unit 2 +12.6% and Unit 3 +10.7%.

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1195619604.05.0 (1960s)
Unit 2196619704.35.4 (1970s)
Unit 3196619714.85.4 (1970s)

Nearest tracked nuclear sites

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationIllinois, United States
Coordinates41.3901, -88.2701
Elevationabout 165 mabove sea level
SettingAbout 970 km from the sea
RegionNorthern America
Units by status
Operating: 2
Retired: 1

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
Exelon Corp
Operators
Exelon Generation

Put this plant on your own page: embed a card, or compare it with another plant.

Sources

How these sources are used, including the corrections applied on top of them and what is deliberately left blank · download the underlying data

Try

Searches every page: 1,823 reactors, 592 plants, 158 fuel chain facilities, companies, designs, accidents and notes.