Chernobyl nuclear power plant

Chernobyl nuclear power plant is a nuclear site in Ukraine with 6 units on record. None is currently operating.

Operating2Retired1circle area ∝ site capacity Coastlines, borders and lakes: Natural Earth (1:10 million, public domain), which is generalised, so a coastal plant can sit a couple of kilometres off its true shoreline. Site positions: Global Nuclear Power Tracker.
Units on record
6
Operating
0
Operating capacity
not disclosed
Country

Units

UnitStatusTypeModelGross MWOnline
Unit 1 Retired LWGR RBMK 800 1978
Unit 2 Retired LWGR RBMK 1,000 1979
Unit 3 Retired LWGR RBMK 1,000 1982
Unit 4 Retired LWGR RBMK 1,000 1984
Unit 5 Cancelled LWGR RBMK 1,000 -
Unit 6 Cancelled LWGR RBMK 1,000 -

Unit by unit

Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.

Chernobyl nuclear power plant 1 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelRBMK-1000
Size classLarge
Gross capacity800MW
Net capacity740MW
Thermal output3,200MWt
Enrichment2–2.6% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorMintopenergo Of Ukraine
Construction start1 Mar 1970
First criticality2 Aug 1977
Grid connection26 Sep 1977
Commercial operation27 May 1978
Permanent shutdown30 Nov 1996

Chernobyl nuclear power plant 2 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelRBMK-1000
Size classLarge
Gross capacity1,000MW
Net capacity925MW
Thermal output3,200MWt
Enrichment2–2.6% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorMintopenergo Of Ukraine
Construction start1 Feb 1973
First criticality17 Nov 1978
Grid connection21 Dec 1978
Commercial operation28 May 1979
Permanent shutdown11 Oct 1991

Chernobyl nuclear power plant 3 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelRBMK-1000
Size classLarge
Gross capacity1,000MW
Net capacity925MW
Thermal output3,200MWt
Enrichment2–2.6% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorMintopenergo Of Ukraine
Construction start1 Mar 1976
First criticality2 Jun 1981
Grid connection3 Dec 1981
Commercial operation8 Jun 1982
Permanent shutdown15 Dec 2000

Chernobyl nuclear power plant 4 Retired

Reactor typeLight water graphite reactor (LWGR)
ModelRBMK-1000
Size classLarge
Gross capacity1,000MW
Net capacity925MW
Thermal output3,200MWt
Enrichment2–2.6% U-235
NSSS vendorRosatom
OwnerSE NNEGC "Energoatom"100%
OperatorMintopenergo Of Ukraine
Construction start1 Apr 1979
First criticality26 Nov 1983
Grid connection22 Dec 1983
Commercial operation26 Mar 1984
Permanent shutdown26 Apr 1986

Accident on record: Chernobyl, 1986-04-26, INES level 7, major accident.

Chernobyl nuclear power plant 5 Cancelled

Reactor typeLight water graphite reactor (LWGR)
ModelRBMK-1000
Size classLarge
Gross capacity1,000MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment2–2.6% U-235
NSSS vendorRosatom
Cancelled1989
Milestonesno dates on record

Chernobyl nuclear power plant 6 Cancelled

Reactor typeLight water graphite reactor (LWGR)
ModelRBMK-1000
Size classLarge
Gross capacity1,000MW
Net capacitynot disclosed
Thermal outputnot disclosed
Enrichment2–2.6% U-235
NSSS vendorRosatom
Cancelled1989
Milestonesno dates on record

Chernobyl nuclear power plant in context

The 4 units with both construction and grid dates on record took 4.7 to 7.6 years (median 5.8) from construction start to grid connection; the median across all reactors connected in the 1980s is 7.3 years.

The nearest other tracked nuclear sites are Khmelnitski nuclear power plant (271 km) and Rivne nuclear power plant (292 km).

Build time by unit

UnitConstruction startGrid connectionYearsFleet median, same decade
Unit 1197019777.65.4 (1970s)
Unit 2197319785.95.4 (1970s)
Unit 3197619815.87.3 (1980s)
Unit 4197919834.77.3 (1980s)

Nearest tracked nuclear sites

SiteCountryDistanceOperating GW gross
Khmelnitski nuclear power plantUkraine271 km2.0
Rivne nuclear power plantUkraine292 km2.8

How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.

Site detail
LocationKyivska, Ukraine
Coordinates51.3893, 30.1066
Elevationabout 140 mabove sea level
SettingAbout 470 km from the sea
RegionEastern Europe
Units by status
Retired: 4
Cancelled: 2

Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.

Owners & operators
Owners
SE NNEGC "Energoatom"
Operators
Mintopenergo Of Ukraine

Put this plant on your own page: embed a card, or compare it with another plant.