Changjiang nuclear power plant is a nuclear power station in China with 2 operating units totalling 1,300 MW gross. The site has 4 units on record in total.
Units
| Unit | Status | Type | Model | Gross MW | Online |
|---|---|---|---|---|---|
| Unit 1 | PWR | CNP-600 | 650 | 2015 | |
| Unit 2 | PWR | CNP-600 | 650 | 2016 | |
| Unit 3 | Under construction | PWR | HPR-1000 | 1,198 | 2026 |
| Unit 4 | Under construction | PWR | HPR-1000 | 1,200 | 2027 |
Unit by unit
Each unit's rating, type and milestone dates as recorded by the Global Nuclear Power Tracker, with any correction we made to it. A dash or "not disclosed" means the source does not give the value.
Changjiang nuclear power plant 1
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-600 |
| Size class | Large |
| Gross capacity | 650MW |
| Net capacity | 601MW |
| Thermal output | 1,930MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | Huaneng Nuclear Power Development Co Ltd100% |
| Operator | Huaneng Hainan Changjiang Nuclear Power |
| Construction start | 25 Apr 2010 |
|---|---|
| First criticality | 12 Oct 2015 |
| Grid connection | 7 Nov 2015 |
| Commercial operation | 25 Dec 2015 |
Changjiang nuclear power plant 2
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | CNP-600 |
| Size class | Large |
| Gross capacity | 650MW |
| Net capacity | 601MW |
| Thermal output | 1,930MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | Huaneng Nuclear Power Development Co Ltd100% |
| Operator | Huaneng Hainan Changjiang Nuclear Power |
| Construction start | 21 Nov 2010 |
|---|---|
| First criticality | 9 Jun 2016 |
| Grid connection | 20 Jun 2016 |
| Commercial operation | 12 Aug 2016 |
Changjiang nuclear power plant 3 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,198MW |
| Net capacity | 1,000MW |
| Thermal output | 3,190MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | Huaneng Nuclear Power Development Co Ltd100% |
| Operator | Huaneng Hainan Changjiang Nuclear Power |
| Construction start | 1 Jan 2020 |
|---|---|
| Commercial operation | 1 Jan 2026 |
Changjiang nuclear power plant 4 Under construction
| Reactor type | Pressurised water reactor (PWR) |
|---|---|
| Model | HPR-1000 |
| Size class | Large |
| Gross capacity | 1,200MW |
| Net capacity | 1,000MW |
| Thermal output | 3,190MWt |
| Enrichment | 3–5% U-235 |
| NSSS vendor | China National Nuclear Corporation |
| Owner | Huaneng Nuclear Power Development Co Ltd100% |
| Operator | Huaneng Hainan Changjiang Nuclear Power |
| Construction start | 28 Dec 2021 |
|---|---|
| Commercial operation | 1 Jan 2027 |
Changjiang nuclear power plant in context
By gross operating capacity Changjiang nuclear power plant is the 16th largest of 18 operating nuclear sites in China, holding 2% of the country's operating capacity, and ranks 123rd of 172 worldwide.
Its operating units started up between 2015 and 2016; the median unit is 10.5 years old, older than the median of 10.0 in China.
The 2 units with both construction and grid dates on record took 5.5 to 5.6 years (median 5.6) from construction start to grid connection; the median across all reactors connected in the 2010s is 5.9 years.
The nearest other tracked nuclear sites are Linglong nuclear power plant (0 km), Bailong nuclear power plant (238 km) and Fangchenggang nuclear power plant (248 km).
Build time by unit
| Unit | Construction start | Grid connection | Years | Fleet median, same decade |
|---|---|---|---|---|
| Unit 1 | 2010 | 2015 | 5.5 | 5.9 (2010s) |
| Unit 2 | 2010 | 2016 | 5.6 | 5.9 (2010s) |
Nearest tracked nuclear sites
| Site | Country | Distance | Operating GW gross |
|---|---|---|---|
| Linglong nuclear power plant | China | 0 km | - |
| Bailong nuclear power plant | China | 238 km | - |
| Fangchenggang nuclear power plant | China | 248 km | 4.5 |
How these are worked out: ranks use gross operating capacity; ages count from the start-up year on record, as on the age page; build times run from construction start to grid connection, as on the build-times page; ratings are the tracker's net and design net capacity, as on the uprates page. Distances are straight-line between exact positions, so a site with only an approximate position gets none. A unit missing a date or a rating is left out of the figure that needs it.
Earthquakes nearby
Loading the latest USGS check…
| Time (UTC) | Mag | Depth | Epicentre | Distance |
|---|
Magnitude 4.0 and above within 200 km of Changjiang nuclear power plant's listed coordinates, past 30 days. This is distance, not shaking: it says nothing about damage or any change in operation. Every plant.
| Location | Haiwei, Hainan, China |
|---|---|
| Coordinates | 19.4591, 108.8963 |
| Elevation | about 30 mabove sea level |
| Setting | On the sea coast, 2 km from the water |
| Region | Eastern Asia |
| Units by status | Operating: 2 Under construction: 2 |
Elevation is read at the listed coordinates from a 30 m terrain model (SRTM 30 m). Two independent models differ by a median of 6 m across our plants and by up to about 40 m on steep or coastal ground, and a point on a shoreline can read as sea level. Distance to the water is measured to a generalised 1:10 million coastline, so a few kilometres or less is not resolved. This is context, not a design-basis or flood-risk figure.
| Owners | Huaneng Nuclear Power Development Co Ltd |
|---|---|
| Operators | Huaneng Hainan Changjiang Nuclear Power |
Put this plant on your own page: embed a card, or compare it with another plant.
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release , CC BY 4.0 · retrieved 2026-09-06