Sendai nuclear power plant 1

Operating Japan
Gross capacity
890MW

Sendai nuclear power plant 1 is a pressurised water reactor unit at Sendai nuclear power plant in Japan rated at 890 MW gross. It is operating. Commercial operation began 4 Jul 1984.

Specification
Reactor type Pressurised water reactor (PWR)
ModelM (3-loop)
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity890MW
Net capacity (reference)846MW
Net capacity (design)846MW
Thermal output2,660MWt
Typical enrichment3–5% U-235
Ownership & location
SiteSendai nuclear power plant
Unit1
CountryJapan
OwnerKyushu Electric Power Co Inc100%
OperatorKyushu Electric Power
Coordinates 31.8335, 130.1887
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 15 Dec 1979Construction start
  2. 25 Aug 1983First criticality
  3. 16 Sep 1983Grid connection
  4. 4 Jul 1984Commercial operation

Other units at Sendai nuclear power plant

UnitStatusGross MW
Sendai nuclear power plant 2 Operating 890
Sendai nuclear power plant 3 Shelved 1,590

Other M (3-loop) units

9 units worldwide share this model designation.

UnitCountryStatusGross MW
Ikata nuclear power plant 3 Japan Operating 890
Mihama nuclear power plant 3 Japan Operating 826
Sendai nuclear power plant 2 Japan Operating 890
Takahama nuclear power plant 1 Japan Operating 826
Takahama nuclear power plant 2 Japan Operating 826
Takahama nuclear power plant 3 Japan Operating 870
Takahama nuclear power plant 4 Japan Operating 870
Tomari nuclear power plant 3 Japan Under construction 912