Bhimpur nuclear power plant 1
Cancelled (inferred) India
Gross capacity
700MW
Bhimpur nuclear power plant 1 is a pressurised heavy water reactor unit at Bhimpur nuclear power plant in India rated at 700 MW gross. It is cancelled (a status Global Energy Monitor inferred from an absence of observed progress).
Specification
| Reactor type | Pressurised heavy water reactor (PHWR) |
|---|---|
| Model | PHWR-700 |
| Size class | Large |
| Coolant | Heavy water |
| Moderator | Heavy water |
| Gross capacity | 700MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| Typical enrichment | Natural uranium, 0.71% U-235 |
Ownership & location
| Site | Bhimpur nuclear power plant |
|---|---|
| Unit | 1 |
| Country | India |
| Coordinates | 21.9054, 77.5420approximate |
Fuel chain for this unit
Fuel form
Natural uranium dioxide bundles
Enrichment
Natural uranium, 0.71% U-235 no enrichment required
Who makes this assembly
- BWX Technologies CANDU fuel bundles, natural uranium
- Cameco Corporation CANDU fuel bundles, natural uranium
- China North Nuclear Fuel Company CANDU fuel bundles
- KEPCO Nuclear Fuel CANDU fuel bundles
- Nuclear Power Corporation of India PHWR fuel bundles, natural uranium
Upstream
This unit runs on natural uranium, so its fuel chain has no enrichment step at all: mine → mill → conversion → fabrication. That is the shortest fuel chain of any commercial reactor type, and it makes the operator independent of the four organisations that control enrichment worldwide.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Other units at Bhimpur nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Bhimpur nuclear power plant 2 | Cancelled | 700 |
| Bhimpur nuclear power plant 3 | Cancelled | 700 |
| Bhimpur nuclear power plant 4 | Cancelled | 700 |
Other PHWR-700 units
16 units worldwide share this model designation.
| Unit | Country | Status | Gross MW |
|---|---|---|---|
| Kakrapar nuclear power plant 3 | India | 700 | |
| Kakrapar nuclear power plant 4 | India | 700 | |
| Bhimpur nuclear power plant 2 | India | Cancelled | 700 |
| Bhimpur nuclear power plant 3 | India | Cancelled | 700 |
| Bhimpur nuclear power plant 4 | India | Cancelled | 700 |
| Chutka nuclear power plant 1 | India | Pre-construction | 700 |
| Chutka nuclear power plant 2 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 1-1 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 1-2 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 2-3 | India | Pre-construction | 700 |
| Gorakhpur Haryana nuclear power plant 2-4 | India | Pre-construction | 700 |
| Mahi Banswara nuclear power plant 1-1 | India | Pre-construction | 700 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2024-05-20
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted