Bataan nuclear power plant 2
Announced Philippines
Gross capacity
579MW
Bataan nuclear power plant 2 is a nuclear unit at Bataan nuclear power plant in Philippines rated at 579 MW gross. It is announced. Commercial operation began 1 Jan 2032.
Specification
| Reactor type | not disclosed |
|---|---|
| Model | not disclosed |
| Size class | not disclosed |
| Coolant | not disclosed |
| Moderator | not disclosed |
| Gross capacity | 579MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| Typical enrichment | not disclosed |
Ownership & location
| Site | Bataan nuclear power plant |
|---|---|
| Unit | 2 |
| Country | Philippines |
| Coordinates | 14.6294, 120.3138 |
Fuel chain for this unit
Fuel form
not established for this unit's type
Enrichment
not established
Upstream
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 1 Jan 2032Commercial operation
Other units at Bataan nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Bataan nuclear power plant 1 | Mothballed | 621 |
| Bataan nuclear power plant 1 Repower | Announced | 621 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-06-24
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted