Taishan nuclear power plant 1-2

Operating China
Gross capacity
1,750MW

Taishan nuclear power plant 1-2 is a pressurised water reactor unit at Taishan nuclear power plant in China rated at 1,750 MW gross. It is operating. Commercial operation began 7 Sep 2019.

Specification
Reactor type Pressurised water reactor (PWR)
ModelEPR-1750
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity1,750MW
Net capacity (reference)1,660MW
Net capacity (design)1,660MW
Thermal output4,590MWt
Typical enrichment3–5% U-235
Ownership & location
SiteTaishan nuclear power plant
Unit1-2
CountryChina
OwnerTaishan Nuclear Power Industry Investment Co Ltd100%
OperatorTaishan Nuclear Power Joint Venture
Coordinates 21.9183, 112.9818
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 2010Construction start
  2. 28 May 2019First criticality
  3. 23 Jun 2019Grid connection
  4. 7 Sep 2019Commercial operation

Other units at Taishan nuclear power plant

UnitStatusGross MW
Taishan nuclear power plant 1-1 Operating 1,750
Taishan nuclear power plant 2-3 Pre-construction 1,150
Taishan nuclear power plant 2-4 Pre-construction 1,150

Other EPR-1750 units

4 units worldwide share this model designation.

UnitCountryStatusGross MW
Taishan nuclear power plant 1-1 China Operating 1,750
Hinkley Point nuclear power plant C1 United Kingdom Under construction 1,720
Hinkley Point nuclear power plant C2 United Kingdom Under construction 1,720

Sources