Skip to content
nuclearchain

Sellafield (Hitachi) nuclear power plant 1

Cancelled United Kingdom
Gross capacity
311MW

Sellafield (Hitachi) nuclear power plant 1 is a fast reactor unit at Sellafield (Hitachi) nuclear power plant in United Kingdom rated at 311 MW gross. It is cancelled.

Specification
Reactor type Fast reactor (FBR)
ModelPRISM
Size classLarge
CoolantLiquid sodium or lead
ModeratorNone
Gross capacity311MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
Typical enrichment15–20% fissile, or plutonium
Ownership & location
SiteSellafield (Hitachi) nuclear power plant
Unit1
CountryUnited Kingdom
OwnerGE Hitachi Nuclear Energy100%
Coordinates 54.4224, -3.4868
Cancelled2012
Fuel chain for this unit
Fuel form
Mixed oxide or metallic fuel
Enrichment
15–20% fissile, or plutonium
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Other units at Sellafield (Hitachi) nuclear power plant

UnitStatusGross MW
Sellafield (Hitachi) nuclear power plant 2 Cancelled 311

Other PRISM units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Sellafield (Hitachi) nuclear power plant 2 United Kingdom Cancelled 311

Sources