Skip to content
nuclearchain

North Teeside nuclear power plant 3

Announced United Kingdom Small modular
Gross capacity
300MW

North Teeside nuclear power plant 3 is a small modular reactor unit at North Teeside nuclear power plant in United Kingdom rated at 300 MW gross. It is announced. Commercial operation began 1 Jan 2030.

Specification
Reactor type small modular reactor
ModelAP300
Size classSmall modular
Coolantnot disclosed
Moderatornot disclosed
Gross capacity300MW
Net capacity (reference)not disclosed
Net capacity (design)not disclosed
Thermal outputnot disclosed
Typical enrichmentnot disclosed
Ownership & location
SiteNorth Teeside nuclear power plant
Unit3
CountryUnited Kingdom
OwnerCommunity Nuclear Power100%
Coordinates 54.5889, -1.1875approximate
Fuel chain for this unit
Fuel form
not established for this unit's type
Enrichment
not established
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jan 2030Commercial operation

Other units at North Teeside nuclear power plant

Other AP300 units

4 units worldwide share this model designation.

UnitCountryStatusGross MW
North Teeside nuclear power plant 1 United Kingdom Announced 300
North Teeside nuclear power plant 2 United Kingdom Announced 300
North Teeside nuclear power plant 4 United Kingdom Announced 300

Sources