Kemmerer nuclear power plant 1
Under construction United States
Gross capacity
345MW
Kemmerer nuclear power plant 1 is a fast reactor unit at Kemmerer nuclear power plant in United States rated at 345 MW gross. It is under construction. Commercial operation began 1 Jan 2031.
Specification
| Reactor type | Fast reactor (FBR) |
|---|---|
| Model | not disclosed |
| Size class | Large |
| Coolant | Liquid sodium or lead |
| Moderator | None |
| Gross capacity | 345MW |
| Net capacity (reference) | not disclosed |
| Net capacity (design) | not disclosed |
| Thermal output | not disclosed |
| Typical enrichment | 15–20% fissile, or plutonium |
Ownership & location
| Site | Kemmerer nuclear power plant |
|---|---|
| Unit | 1 |
| Country | United States |
| Owner | Terrapower LLC100% |
| Operator | Terrapower |
| Coordinates | 41.7924, -110.5374approximate |
Fuel chain for this unit
Fuel form
Mixed oxide or metallic fuel
Enrichment
15–20% fissile, or plutonium
Who makes this assembly
- TVEL Fuel Company Fast reactor fuel, including MOX
Upstream
Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.
Fabricator capability is recorded against reactor type and model line, not against named units —
utilities do not publish fuel contracts. See the fuel chain.
Timeline
- 23 Apr 2026Construction start
- 1 Jan 2031Commercial operation
Other units at Kemmerer nuclear power plant
| Unit | Status | Gross MW |
|---|---|---|
| Kemmerer nuclear power plant 1B | Shelved | 345 |
| Kemmerer nuclear power plant 1C | Shelved | 345 |
| Kemmerer nuclear power plant 1D | Shelved | 345 |
| Kemmerer nuclear power plant 1E | Shelved | 345 |
| Kemmerer nuclear power plant 1F | Shelved | 345 |
Sources
- Global Nuclear Power Tracker, Global Energy Monitor, August 2026 release — CC BY 4.0 · retrieved 2026-09-06 · this unit last researched by GEM on 2026-06-25
- GEM.wiki entry (further reading) — CC BY-SA 4.0 — linked, not quoted