Skip to content
nuclearchain

Armenian nuclear power plant 2

Operating Armenia
Gross capacity
448MW

Armenian nuclear power plant 2 is a pressurised water reactor unit at Armenian nuclear power plant in Armenia rated at 448 MW gross. It is operating. Commercial operation began 3 May 1980.

Specification
Reactor type Pressurised water reactor (PWR)
ModelVVER V-270
Size classLarge
CoolantLight water
ModeratorLight water
Gross capacity448MW
Net capacity (reference)416MW
Net capacity (design)375MW
Thermal output1,375MWt
Typical enrichment3–5% U-235
Ownership & location
SiteArmenian nuclear power plant
Unit2
CountryArmenia
OwnerMinistry Of Territorial Administration And Infrastructure100%
OperatorClosed Joint Stock Company Armenian NPP
Coordinates 40.1817, 44.1423
Planned retirement2036planned, not actual
Fuel chain for this unit
Fuel form
Uranium dioxide pellets in zirconium-alloy cladding
Enrichment
3–5% U-235
Who makes this assembly
Upstream

Enriched fuel means this unit sits downstream of five conversion plants and four enrichment operators holding 88% of world capacity between the top three.

Fabricator capability is recorded against reactor type and model line, not against named units — utilities do not publish fuel contracts. See the fuel chain.

Timeline

  1. 1 Jul 1975Construction start
  2. 1 Jan 1980First criticality
  3. 5 Jan 1980Grid connection
  4. 3 May 1980Commercial operation

Other units at Armenian nuclear power plant

UnitStatusGross MW
Armenian nuclear power plant 1 Retired 408
Armenian nuclear power plant 3 Announced 1,200

Other VVER V-270 units

2 units worldwide share this model designation.

UnitCountryStatusGross MW
Armenian nuclear power plant 1 Armenia Retired 408

Sources